Multi-Unit Building Specialists

Every riser.
Every branch.
Every unit.

When one burst line floods three families, you need a crew that reads blueprints, not just service tickets. Copper, PEX, galvanized — we thread it all through shared walls and stacked risers.

We'll show you a cross-section of what's likely behind your walls

340+
Units repiped
18
Buildings completed
4-day
Average repipe
BUILDING CROSS-SECTION
1:50 SCALE
GRADEFL-1FL-2FL-3ROOFUNIT 1AUNIT 1BUNIT 2AUNIT 2BUNIT 3AUNIT 3B
Cold Supply
Hot Supply
SV
Shutoff Valve
Scroll to case studies
Case File Archive

Buildings we've
made whole again

Each card is a real building. Tap to flip and read the resolution — symptom through scope to sign-off.

Before repipe: Recurring third-floor leaks every winter at Townhouse Row in Eastlake, Seattle WA
CriticalTownhouse Row
Tap for resolution
Eastlake, Seattle WA
Symptom

Recurring third-floor leaks every winter

Diagnosis

Corroded galvanized shared riser behind party wall — pinhole failures accelerated by calcium buildup and 40-year pipe age.

Units
8
Duration
4 days
Pipe
PEX-A
After repipe: resolved Recurring third-floor leaks every winter at Eastlake, Seattle WA
✓ Resolved
← Back
Resolution

Full riser replacement with PEX manifold system. New isolation valves on every branch. Completed in four days with zero resident displacement.

"Three winters of water damage claims, settled in four days. The HOA board finally stopped getting angry emails."

M
Marcus T.
HOA Board President
Before repipe: Discolored water in units 4–9 at Low-Rise Condo in Capitol Hill, Seattle WA
High RiskLow-Rise Condo
Tap for resolution
Capitol Hill, Seattle WA
Symptom

Discolored water in units 4–9

Diagnosis

Original 1968 galvanized supply lines oxidizing from the inside — affecting only the east wing due to flow direction.

Units
12
Duration
3 days
Pipe
Copper + PEX
After repipe: resolved Discolored water in units 4–9 at Capitol Hill, Seattle WA
✓ Resolved
← Back
Resolution

Targeted east-wing repipe with copper main and PEX branches. Pressure-balanced the system. No drywall replacement needed.

"They diagnosed the east-wing isolation in twenty minutes. Every other contractor wanted to repipe the whole building."

P
Priya K.
Property Manager
Before repipe: Low pressure floors 5–7 during peak morning hours at Mid-Rise Condo in South Lake Union, Seattle WA
High RiskMid-Rise Condo
Tap for resolution
South Lake Union, Seattle WA
Symptom

Low pressure floors 5–7 during peak morning hours

Diagnosis

Undersized vertical riser installed during 2004 conversion — 3/4" pipe serving 14 units. PRV also failing.

Units
22
Duration
6 days
Pipe
Copper
After repipe: resolved Low pressure floors 5–7 during peak morning hours at South Lake Union, Seattle WA
✓ Resolved
← Back
Resolution

Upsized riser to 1.5" copper with new PRV and pressure tank. Coordinated with building engineer for structural penetration permits.

"They pulled the permits, coordinated with our structural engineer, and delivered constant pressure on every floor. Six days."

D
Daniel O.
Condo Developer
Before repipe: Preventive check — building age unknown at Townhouse Row in Ballard, Seattle WA
High RiskTownhouse Row
Tap for resolution
Ballard, Seattle WA
Symptom

Preventive check — building age unknown

Diagnosis

CPVC installed 1992 — classic stress-fracture pattern at fittings. Estimated 2–3 years before first failure event.

Units
16
Duration
5 days
Pipe
PEX-A
After repipe: resolved Preventive check — building age unknown at Ballard, Seattle WA
✓ Resolved
← Back
Resolution

Full PEX-A repipe before first failure. Documented scope delivered to HOA for reserve fund planning. Zero insurance claims to date.

"Diagnosed the CPVC risk before anything failed. Saved the HOA an estimated $80K in water damage claims."

S
Sandra M.
Property Manager
All projects · Seattle Metro · 2021–2026
● Building Diagnostic Tool

Diagnose your building

Five questions. Two minutes. Get a risk tier and a tailored scope recommendation — no salesperson, no guessing.

1 / 5

What type of building?

Select the structure that best matches your property

Licensed & Bonded No obligation Results in 2 minutes WA State Certified
340+
Units repiped
Across Seattle metro
18
Buildings completed
Zero warranty callbacks
4.2 days
Average repipe
Multi-unit buildings
$0
Displacement cost
Residents stay in place
Property Managers & HOA Boards

The people who
stopped losing sleep

Every quote is from a real property manager or HOA president in the Seattle metro area.

"Three winters of water damage claims, resolved in four days. The HOA board finally stopped fielding angry emails. Mainline reads blueprints — not just service tickets."

Marcus Thompson, HOA Board President at Eastlake Townhomes, 8 units
Marcus Thompson
HOA Board President
Eastlake Townhomes, 8 units

"They diagnosed the east-wing isolation in twenty minutes. Every other contractor wanted to repipe the whole building. Mainline found the actual fault and scoped only what needed replacing."

Priya Krishnamurthy, Property Manager at Capitol Hill Condos, 12 units
Priya Krishnamurthy
Property Manager
Capitol Hill Condos, 12 units

"They pulled the permits, coordinated with our structural engineer, and delivered constant pressure on every floor. Six days. Zero displacement. The warranty calls never came."

Daniel Okonkwo, Condo Developer at South Lake Union Mid-Rise, 22 units
Daniel Okonkwo
Condo Developer
South Lake Union Mid-Rise, 22 units

"Diagnosed the CPVC stress fractures before anything failed. Delivered a documented scope to the HOA reserve fund committee. Saved us an estimated $80K in future water damage."

Sandra Mejía, Property Manager at Ballard Townhouse Row, 16 units
Sandra Mejía
Property Manager
Ballard Townhouse Row, 16 units
WA State Licensed
Plumbing Contractor
🔒
Fully Bonded
$2M liability coverage
📋
Permit Specialists
Multi-unit projects
🏗
Zero Displacement
Residents stay in place
Start Here

The mechanical room
doesn't lie.

We walk your building. We read the risers. We tell you exactly what's failing, what's next, and what it takes to fix it — in a written scope before a single pipe is touched.

Full Building Repipe
PEX-A or copper — scoped, permitted, completed with zero displacement.
Riser & Branch Replacement
Targeted replacement of failing vertical risers and horizontal branch lines.
New Construction Rough-In
Warranty-proof rough-in for condo developers. Manifold systems standard.
Building Diagnostic Walkthrough
Written risk assessment with scope recommendation. $0 obligation.

Request a Building Walkthrough

No obligation. Written scope delivered within 48 hours.

Licensed & bonded · Seattle metro · Response within 1 business day